Business tips
Plastic and rubber manufacturers run on a few numbers that general-purpose software handles poorly. The cost of a part depends mostly on resin price and grams per part, the margin depends on how much runner and reject material is reground and reused, and the schedule depends on which mold is on which machine. An ERP for plastic manufacturing has to hold those numbers in the bill of materials, the routing and the stock records, or the cost and margin figures will be wrong from the start.
This article covers what the plastics industry needs from an ERP, with a worked example of material cost per part, and how to check a system against it.
What makes plastic manufacturing different
Injection molding, extrusion, blow molding and thermoforming differ in their machines, but they share some features:
- Raw material, mostly resin and masterbatch, is usually the largest cost, and its price moves with oil and petrochemical prices.
- Each cycle produces scrap in the form of runners, sprues, start-up waste and rejected parts, part of which can be reground and fed back.
- Molds and dies are expensive assets, sometimes owned by the customer, and each fits only certain machines.
- Changing a mold or color takes machine time, so the order in which jobs run affects capacity and waste.
- Customers in food packaging, medical and automotive often require batch traceability from resin lot to finished carton.
Material cost per part, worked through
Take an injection-molded part weighing 48 grams, produced in a single-cavity mold with a 6-gram runner, and an expected reject rate of 3%. Resin costs SAR 6.50 per kilogram. The figures are hypothetical.
To deliver 10,000 good parts the machine must run 10,000 ÷ 0.97 = 10,310 shots. Each shot uses 54 grams, so total resin used is 556.74 kg. Of that, the runners (61.86 kg) and the 310 rejected parts (14.88 kg) can be reground, 76.74 kg in total.
| Case | Virgin resin used (kg) | Resin cost (SAR) | Resin cost per good part (SAR) |
|---|---|---|---|
| All regrind reused | 480.00 | 3,120.00 | 0.312 |
| No regrind reused | 556.74 | 3,618.81 | 0.362 |
The difference is about 16% on material cost. In practice regrind is often limited to a share of the mix, and some customers, food packaging in particular, may not accept it at all. The common mistake is a bill of materials that shows only the 48 grams of the part, so every quotation assumes perfect reuse and the margin disappears on jobs where regrind cannot be used.
Pricing when resin prices move
Because resin is the largest cost, many plastics manufacturers agree price formulas with customers that adjust for resin price changes. The ERP should make it easy to recalculate the cost of each part when the resin cost changes, using the bill of materials, and to see which customers’ prices are now below the agreed margin. Make-to-order and make-to-stock products need different handling here, which our article on make to order vs make to stock covers.
Bills of materials and routings for molded parts
A useful bill of materials for a molded part lists the resin and masterbatch by weight, with a wastage allowance, plus inserts, labels and packaging. The routing lists the operations, molding, trimming, assembly and packing, with the machine group, setup time and cycle time for each.
Setup time is where mold changes show up in the cost. A job of 2,000 parts that needs a two-hour mold change carries far more setup cost per part than a run of 50,000. When the routing holds setup and cycle times, the cost per part reflects the batch size, and sales can see why small orders need a higher price.
Molds, machines and maintenance
Company-owned molds belong in the fixed asset register, with their cost, depreciation and location, and customer-owned molds need a record of their own marked with the owner. Recording shots or running hours against each mold supports planned maintenance before quality drops. Machines need the same treatment, since a breakdown on a press stops every job planned for it.
Our article on common problems in manufacturing covers downtime and maintenance planning in more detail.
Quality checks and batch traceability
Incoming resin should be checked and recorded by lot, since a bad lot affects every part made from it. Finished parts are checked for dimensions, weight, appearance and color against the customer’s specification, and rejects are recorded with the reason, so the reject rate used in costing comes from data rather than habit.
When a customer complains, traceability lets you answer which resin lot, machine and date a carton came from, and which other customers received parts from the same lot. That needs batch numbers on raw materials and finished goods, carried through each production order. Our article on batch tracking explains the records involved.
Questions to ask about an ERP for plastic manufacturing
Ask the vendor to show these on screen with one of your own parts:
- A bill of materials with resin by weight and a wastage percentage.
- A routing with setup and cycle time per operation and machine group.
- A production order that consumes material, records good and rejected quantities and returns regrind to stock.
- Batch numbers from resin receipt to finished goods delivery.
- The cost per part after production, against the estimate.
How Tranquil handles plastic manufacturing
Tranquil ERP’s Production module holds several bills of materials and routings per production item, with material quantity and wastage in the bill of materials and setup time, cycle time, fixed and variable cost per operation in the routing. Operations run on workstation groups, which are asset categories flagged as workstations, so presses sit in the fixed asset register, and molds can be recorded there as assets with their depreciation.
Production orders can be raised directly or from an approved sales order, materials are requested and issued to the order, and each operation records the quantity produced. Production cost is built from material, labor and overhead, and the production efficiency report compares estimated and actual figures. Quality checks record failed quantities, items can be batch-tracked with an auto-generated batch number, and operations can be subcontracted to a supplier. Details are on the manufacturing page.
Frequently asked questions
What is plastic manufacturing ERP software?
It is an ERP set up for the way plastics and rubber manufacturers work, with bills of materials by resin weight, routings with machine setup and cycle times, scrap and regrind tracking, molds as assets and batch traceability, linked to sales, purchasing, stock and accounts.
How do you calculate material cost for a molded part?
Multiply the shot weight, part plus runner, by the number of shots needed for the good quantity after rejects, then subtract any regrind that is reused. Multiply the virgin resin used by its price per kilogram and divide by the good parts produced.
Why is regrind important in costing?
Runners and rejects can be a noticeable share of resin used. If they are reground and reused, material cost falls. If customers do not allow regrind, cost rises. A cost model that ignores this misprices jobs in one direction or the other.
Should molds be recorded as fixed assets?
Molds owned by the company are usually fixed assets and are depreciated over their useful life. Customer-owned molds are recorded separately as the customer’s property. In both cases, recording location, condition and shots run supports maintenance and insurance.